Skip Navigation Links
Home
Pictures
Friends Pages
Downloads
Mailbag
Projects
Links
Contact Us
Join the fun!

Next meeting: 7pm Tue 9th.

Next workday: Sat 8th.

Next steaming: Sun 9th.

Contact Us and join in.
The Goal

The Winter Creek crew will finish the mainline this summer. Thats our goal.
Photos Uploaded - (Feb 5) Weekends Work, plus Steve,Peter and Chris's project pages

70 Meters To Go - (Feb 3) Bridge 6 has track - Now for Bridge 5

Photos Uploaded - (Jan 11) Photos of the weekends work uploaded

90 Metres To Go ! - (Jan 8) 90 metres of track to complete the mainline around the bottom loop. We'll do it before Easter...

Photos Uploaded - (Jan 5) Photos of New Years construction uploaded



Heres a map (not to scale) The bottom loop is currently under construction. A run on the mainline will be about  1km (0.6 mile).


This is a privately owned dual gauge railway with 7.25" and 5" gauge trackage. We like to think of it as a 2.5" scale dual gauge layout, although any compatible equipment is welcome to visit. The Winter Creek is situated in New Zealand on Aucklands' North Shore, (See Contact Us for a world map).

We operate an informal club that meets every Tuesday night  to work on the railway and/or members projects - we can all learn something this way - as well as have a cuppa and a chat.

Saturdays usually find something happening in the shed or out on the line.

Contact us if you are interested in coming along.


site created by richstream