A few shots of South Bend - the horseshoe on an embankment between the tunnel and bridge four. This was the original railhead before I decided to relay in dual guage.

Easing a load of track panels down the 1 in 40 and through the tunnel Sept 2009.

Chris does some last minute leveling while Steve lays out track on the embankment at South Bend. (Sept 2009)

Steve and Peter welding at South Bend on a warm October day in 2009

South Bend from further down towards the future Winter Creek Junction in October 2009. Bridge four in the middle of the picture
Tags: South Bend