Skip Navigation Links
Home
Pictures
Friends Pages
Downloads
Mailbag
Projects
Links
Contact Us
        

Sept 09: 40 metres of track on its way to the railhead. With the sun finally shining we started shipping the track we had made during the winter. Chris takes a load of 12 metre radius sections out from the workshop.

full sized picture here


 

site created by richstream