Pictures Page - Winter 2008 Archive
Here are the photos we took during the winter of 2008
Piles for the new garden access bridge across the railway are being concreted into the ground.
more
Uploaded: 2008 / 12 / 07
April 2008: The afternoon tea special - well, we have to get the tea out to the workplace somehow!
more
Uploaded: 2008 / 12 / 07
April 2008: Freshly ballasted section down to tunnel. Tunnel is out of sight around the next right h...
more
Uploaded: 2008 / 12 / 07
May 24 - Its going to be a beauty!
more
Uploaded: 2008 / 12 / 07
May 24 - Bill working on the big bridge while Chris goes to buy more timber
more
Uploaded: 2008 / 12 / 07
May 4: Bill on the mill - making parts for the turntable.
more
Uploaded: 2008 / 12 / 07
Oct 2008: Taken from top of driveway looking down at house and bridge
more
Uploaded: 2008 / 12 / 07
Weekend of 6th Spetember - FINE Weather! 150% of normal rainfall this winter has meant not a single ...
more
Uploaded: 2008 / 12 / 07
Weekend of 6th September - about 1/3 of the Bridge in this view
more
Uploaded: 2008 / 12 / 07
Weekend of 6th September - Scaffold planks in the bracing are a big help
more
Uploaded: 2008 / 12 / 07
Weekend of 6th September - Chris tests the bridge. 4 stringers of 6" x 2" over 4 foot spans should b...
more
Uploaded: 2008 / 12 / 07
Description Not Found
more
Uploaded: 2008 / 12 / 07
Description Not Found
more
Uploaded: 2008 / 12 / 07
Description Not Found
more
Uploaded: 2008 / 12 / 07
Description Not Found
more
Uploaded: 2008 / 12 / 07
Description Not Found
more
Uploaded: 2008 / 12 / 07
Sept 08. Bridge ready for its deck
more
Uploaded: 2008 / 12 / 07
Oct 2008: Bill and Chris working on the big bridge
more
Uploaded: 2008 / 12 / 07
May 10: Chris and Bill working on the big trestle - concreting in the centre pile of each bent
more
Uploaded: 2008 / 12 / 07
May 10: Chris and Bill working on the big trestle - Starting the leveling process. It took most of a...
more
Uploaded: 2008 / 12 / 07
May 10: Chris and Steve working on the big trestle - First bents take shape as the outside piles go ...
more
Uploaded: 2008 / 12 / 07
May 10: Chris and Steve working on the big trestle - The bridge will be a key feature of the railway
more
Uploaded: 2008 / 12 / 07
May 1: Chris and Steve work on the small Diesel engine. Originally intended for train use it will be...
more
Uploaded: 2008 / 12 / 07
Oct 2008: Chris Welding the turntable bridge
more
Uploaded: 2008 / 12 / 07
April 2008: Working on the access bridge. This bridge is used for mower access between lawns and is ...
more
Uploaded: 2008 / 12 / 07
April 2008: Another view of the access bridge. This bridge is used for mower access between lawns an...
more
Uploaded: 2008 / 12 / 07
Oct 2008: The first real train on the bridge carries the four builders - we must have faith in our c...
more
Uploaded: 2008 / 12 / 07
Nov 12. While Steve and Bill worked on the boiler, Darryl, Chris and Peter hung the new lighting rig...
more
Uploaded: 2008 / 12 / 07
Nov 12. That apex is 5 metres up (17 feet). Doesn't look high, but it sure focussed my mind!
more
Uploaded: 2008 / 12 / 07
Oct 2008: We needed to test the bridge - what a good excuse to bring #24 out for a run. (Alas not in...
more
Uploaded: 2008 / 12 / 07
Oct 2008: We needed to test the bridge (2) - what a good excuse to bring #24 out for a run. (Alas no...
more
Uploaded: 2008 / 12 / 07
Oct 2008: We needed to test the bridge (3) - what a good excuse to bring #24 out for a run. (Alas no...
more
Uploaded: 2008 / 12 / 07
April 26: We had a stand at the North Shore hobby expo and swap meet. The Three of us on the stand
more
Uploaded: 2008 / 12 / 07
Peter at the south entrance to tunnel #1 fixing sleepers.
more
Uploaded: 2008 / 12 / 07
Oct 2008: Peter on his rolling seat - fondly know and Peters Pullman Palace"
more
Uploaded: 2008 / 12 / 07
April 2008: Peter and Steve use the tram to try out the tunnel track.
more
Uploaded: 2008 / 12 / 07
April 2008: Peter and Steve use the tram to try out the tunnel track.
more
Uploaded: 2008 / 12 / 07
April 2008: Peter and Steve use the tram to try out the tunnel track.
more
Uploaded: 2008 / 12 / 07
April 2008: At the farm bridge project site.
more
Uploaded: 2008 / 12 / 07
April 2008: Peter and Steve use the tram to try out the tunnel track.
more
Uploaded: 2008 / 12 / 07
April 2008: Peter and Steve use the tram to try out the tunnel track.
more
Uploaded: 2008 / 12 / 07
Sept 08. Detail shot showing how we curved the stringers to make the bridge extra strong. The table-...
more
Uploaded: 2008 / 12 / 07
May 1: Phew - those injectors need some more work I think! Chris and Steve work on the small Diesel ...
more
Uploaded: 2008 / 12 / 07
May 4: Sunday was a cold and wet day - fire was on. Water always hot for a cuppa, and soupy noodles ...
more
Uploaded: 2008 / 12 / 07
Turntable and Steaming bays start to take shape.
more
Uploaded: 2008 / 12 / 07
Turntable and Steaming bays start to take shape.
more
Uploaded: 2008 / 12 / 07
Description Not Found
more
Uploaded: 2008 / 12 / 07
Description Not Found
more
Uploaded: 2008 / 12 / 07
Steve and son Owen working on the railhead as it enters Tunnel #1.
more
Uploaded: 2008 / 12 / 07
Oct 2008: Steve and Peter check out the sights
more
Uploaded: 2008 / 12 / 07
Steve and Peter working inside tunnel #1. We used a different track fixing method here. Each rail ha...
more
Uploaded: 2008 / 12 / 07
May 10: Steve working on the big trestle - Every house should have one at the bottom of their lawn!
more
Uploaded: 2008 / 12 / 07
Oct 2008: Steve on #24. Caption competition winner "Where's all the steam gone?"
more
Uploaded: 2008 / 12 / 07
April 2008: Nearing the farm bridge project site. Looks like Peter and Steve have had an argument?
more
Uploaded: 2008 / 12 / 07
April 26: We had a stand at the North Shore hobby expo and swap meet. Here's Peter and Steve ready t...
more
Uploaded: 2008 / 12 / 07
April 2008: What better way to roll the ballast?
more
Uploaded: 2008 / 12 / 07
April 2008: Grant watches on as Steve rolls the fresh ballast. (Well that was our excuse anyway)
more
Uploaded: 2008 / 12 / 07
April 26: We had a stand at the North Shore hobby expo and swap meet. This might scare the public!
more
Uploaded: 2008 / 12 / 07
August 10: Carrying the first truss out to the bridge site
more
Uploaded: 2008 / 12 / 07
August 10: Carefully moving it into place
more
Uploaded: 2008 / 12 / 07
August 10: Balancing act
more
Uploaded: 2008 / 12 / 07
August 10: One up - One to go!
more
Uploaded: 2008 / 12 / 07
Description Not Found
more
Uploaded: 2008 / 12 / 07
Description Not Found
more
Uploaded: 2008 / 12 / 07
Description Not Found
more
Uploaded: 2008 / 12 / 07
Description Not Found
more
Uploaded: 2008 / 12 / 07
April 2008: Track in tunnel! Just awaiting the 5 inch rail...
more
Uploaded: 2008 / 12 / 07