Feb132012

Jan til Feb 12

Published by Admin at 3:19 PM under Operating Days | Signalling System

Here is a grab-bag of photos mostly taken by Peter of activity in the last month or so.



[Google] [Facebook] [Digg] [Reddit] [del.icio.us] [StumbleUpon]

Tags:

E-mail | Permalink | Trackback | Post RSSRSS comment feed 0 Responses

Nov072011

All Quiet on the home front

Published by Admin at 8:26 PM under Train Advice Notices

Sorry there have been no updates for awhile. Been busy with work, and you know what they say about all work and no play!

Stay tuned.



[Google] [Facebook] [Digg] [Reddit] [del.icio.us] [StumbleUpon]

Tags:

E-mail | Permalink | Trackback | Post RSSRSS comment feed 0 Responses

Jun192011

Tunnel Construction Photo Gallery

Published by Admin at 3:55 PM under Track Construction

Here is a series of photos showing construction methods for the tunnel. It was built by myself in 2005 for the original 7.25" only line, and marks the spot where the new dual guage line meets the original alignment through the tunnel, around horseshoe curve known as South Bend and across bridge 4.

 



[Google] [Facebook] [Digg] [Reddit] [del.icio.us] [StumbleUpon]

Tags:

E-mail | Permalink | Trackback | Post RSSRSS comment feed 0 Responses

Jun062011

Big Cutting Construction Photo Gallery

Published by Admin at 3:45 PM under Track Construction

A selection of photographs of construction in the big cutting on the lower mainline loop.

(Click on any photo to see a larger version with caption.)

 



[Google] [Facebook] [Digg] [Reddit] [del.icio.us] [StumbleUpon]

Tags:

E-mail | Permalink | Trackback | Post RSSRSS comment feed 0 Responses