Feb132012

Jan til Feb 12

Published by Admin at 3:19 PM under Operating Days | Signalling System

Here is a grab-bag of photos mostly taken by Peter of activity in the last month or so.



[Google] [Facebook] [Digg] [Reddit] [del.icio.us] [StumbleUpon]

Tags:

E-mail | Permalink | Trackback | Post RSSRSS comment feed 0 Responses

Aug282011

Video Trip around the Winter Creek

Published by Chris Draper at 5:11 PM under Operating Days | Steam Locomotives

Steve held the video camera just above the cab of his 5" guage Sandy River No 24 for a trip around the line last Saturday. You can watch it here on You Tube

The trip starts at the apex of the bottom loop beside the signal box and does a complete circuit. Watch for glimspes of Grant Alexanders 7.25" No 24 as he waits for access to the single line running section



[Google] [Facebook] [Digg] [Reddit] [del.icio.us] [StumbleUpon]

Tags:

E-mail | Permalink | Trackback | Post RSSRSS comment feed 0 Responses

Jun192011

Five Inch Opening

Published by Chris Draper at 4:33 PM under Operating Days

Feb 2008 saw the official opening of the new dual guage track. Most of the Hillside branch was in place and we steamed Steve's number 24 for a family picnic day of fun

 



[Google] [Facebook] [Digg] [Reddit] [del.icio.us] [StumbleUpon]

Tags:

E-mail | Permalink | Trackback | Post RSSRSS comment feed 0 Responses

Jun132011

Manukau Live Steamers Visit

This gallery contains a photo record of the Manukau Live Steamers Christmas function December 2009. The track was not complete at this point (Down to South Bend only), but that didnt stop everyone having a good time!

 

(click on any picture to get a larger view complete with caption.)

 



[Google] [Facebook] [Digg] [Reddit] [del.icio.us] [StumbleUpon]

Tags:

E-mail | Permalink | Trackback | Post RSSRSS comment feed 0 Responses