A selection of photographs of construction in the big cutting on the lower mainline loop.
(Click on any photo to see a larger version with caption.)

The big cutting had been dug a few years before. It needed lowering to match final track level in 2009

April 2010 Tracklaying finally entered the big cutting
Tags: Big Cutting