Winter Creek junction was built summer 2010 in the push toward finishing the mainline. It will be a focus point on the mainline as trains gather strength before tackling the heavy grade to the summit - where the Hillside branch joins the main.

Darryl using the trusty Gravely to level trackbed roughed in by Chris with the digger

This will be a busy place where trains rest before tackling the heavy grade.

This photo was taken from the deck of Bridge one.

Steve welding in the junction's pointwork

Pointwork took some time to construct

From the south looking toward bridge six (on the right) and big cutting (to the left of Peter)

Drivers eye view entering the junction

Bridge six is visible but we are taking the left fork through the cutting
Tags: Winter Creek Junction