Apr182012

Signal system Progress

Published by Admin at 5:23 PM under Signalling System | Track Construction

Sunday 14th April - we had a full compliment of crew with Georges return from the Sth Island. Got stuck into getting Air and Water services down to the signalbox, and while the trench was open we took the opportunity to lay signal cables around the turntable leads area. Rod started work in the shed on the new Double Slip for the Signalbox area.

 